# AI data center sites
217 data center and power sites in 46 countries, with local water stress, grid carbon intensity and recorded community objections for each. 68 are in basins rated high or extremely high for water stress.
## Sites by status
| Status | Sites | Capacity |
| --- | --- | --- |
| Operational | 158 | 22.3 GW |
| Halted | 2 | 40 MW |
| Under construction | 28 | 17.4 GW |
| Announced | 22 | 3.8 GW |
| Cancelled | 7 | n/a |
| | | |
| --- | --- | --- |
| Total | 217 | 43.6 GW |
Capacity is the full planned size of each site where reported or estimated; 144 of 217 sites have a figure, taken from company statements, permits or our estimates. Cancelled sites are listed but not counted in capacity. Coverage in China and Russia is less complete than elsewhere: operators there publish few site-level figures, so many sites have no capacity figure. Each site lists its sources and a confidence rating. See the [methodology](https://openbutterfly.com/infrastructure/methodology) for how sites are selected.
Loading map…
## Largest sites
The ten largest sites by planned full capacity. Bar color shows status; most of this capacity is not yet built.
1. [Meta Hyperion (Richland Parish, Louisiana)](https://openbutterfly.com/infrastructure/meta-hyperion-richland)5.0 GW
Meta Platforms Inc. · Under construction · Richland Parish, Louisiana, US
2. [AWS Project Rainier (New Carlisle, Indiana)](https://openbutterfly.com/infrastructure/amazon-rainier-new-carlisle)2.2 GW
Amazon Web Services (Amazon.com Inc.) · Operational · Northern Indiana, US
3. [OpenAI Stargate Project Jupiter (Santa Teresa, Doña Ana County, New Mexico)](https://openbutterfly.com/infrastructure/openai-stargate-dona-ana)2.2 GW
OpenAI Inc. · Under construction · Doña Ana County, New Mexico, US
4. [OpenAI Stargate Shackelford County / Frontier (Shackelford County, Texas)](https://openbutterfly.com/infrastructure/openai-stargate-shackelford)1.4 GW
OpenAI Inc. · Under construction · Texas, US
5. [OpenAI / Oracle Stargate I (Abilene, Texas)](https://openbutterfly.com/infrastructure/openai-stargate-abilene)1.2 GW
OpenAI Inc. · Operational · Texas, US
6. [OpenAI Stargate Milam County (Cameron, Milam County, Texas)](https://openbutterfly.com/infrastructure/openai-stargate-milam)1.2 GW
OpenAI Inc. · Under construction · Texas, US
7. [Google / Adani AI Data Center Campus, Visakhapatnam](https://openbutterfly.com/infrastructure/google-visakhapatnam)1.0 GW
Google (Alphabet Inc.) · Under construction · Andhra Pradesh, India
8. [Meta El Paso AI Data Center (El Paso, Texas)](https://openbutterfly.com/infrastructure/meta-el-paso)1.0 GW
Meta Platforms Inc. · Under construction · Texas, US
9. [Meta Lebanon AI Data Center Campus (Lebanon, Indiana)](https://openbutterfly.com/infrastructure/meta-lebanon-indiana)1.0 GW
Meta Platforms Inc. · Under construction · Central Indiana, US
10. [Meta Prometheus AI Cluster (New Albany, Ohio)](https://openbutterfly.com/infrastructure/meta-prometheus-new-albany)1.0 GW
Meta Platforms Inc. · Under construction · Central Ohio, US
## Sites in water-stressed basins
68 of 217 sites, about 6.4 GW of capacity, are in basins that WRI Aqueduct rates high or extremely high for baseline water stress.
- [OpenAI / Oracle Stargate I (Abilene, Texas)](https://openbutterfly.com/infrastructure/openai-stargate-abilene)
Texas, US · Operational
High
1,200 MW
- [Google / Adani AI Data Center Campus, Visakhapatnam](https://openbutterfly.com/infrastructure/google-visakhapatnam)
Andhra Pradesh, India · Under construction
High
1,000 MW
- [Meta / Sify Technologies AI Data Center, Visakhapatnam](https://openbutterfly.com/infrastructure/meta-visakhapatnam)
Andhra Pradesh, India · Announced
High
500 MW
- [Meta Eagle Mountain AI Data Center Campus](https://openbutterfly.com/infrastructure/meta-eagle-mountain)
Utah, US · Operational
High
400 MW
- [Microsoft Azure Phoenix Campus (Goodyear)](https://openbutterfly.com/infrastructure/microsoft-phoenix)
Maricopa County, Arizona, US · Operational
High
300 MW
- [Google Henderson Data Center Campus](https://openbutterfly.com/infrastructure/google-henderson)
Southern Nevada, US · Operational
Extremely high
250 MW
- [Microsoft / Nscale AI Data Center Campus (Sines, Portugal)](https://openbutterfly.com/infrastructure/microsoft-sines)
Sines, Alentejo Litoral, Portugal · Operational
High
200 MW
- [Microsoft AI Cloud Region Abu Dhabi](https://openbutterfly.com/infrastructure/microsoft-abu-dhabi)
Abu Dhabi, UAE · Operational
Extremely high
200 MW
Largest eight by capacity shown. Water stress is researcher-assigned per site from WRI Aqueduct 4.0; it describes the basin, not the facility's own draw.
## Classification
Explicit AI Infrastructure
: Purpose-built for AI training or inference workloads.
AI-Capable Hyperscale
: General hyperscale data centers with significant AI workloads.
Associated Infrastructure
: Substations, transmission, and power projects serving AI sites.
## Environmental data
Water stress, grid carbon intensity and drought risk are assigned from published sources (WRI Aqueduct, EPA eGRID, IEA, China MEE, Ember). Each value shows its source and confidence tier.
## What we do not claim
We do not attribute environmental harm to specific facilities. Community concern flags record events reported in public sources. They do not imply causation. See the [methodology](https://openbutterfly.com/infrastructure/methodology) for full definitions.